Automotive Interior Trim Mould
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Zhejiang
-
Validity to:
Long-term effective
-
Last update:
2020-01-21 22:57
-
Browse the number:
250
+
- Contactaixin:
yaxinmy(Mr.)
- Email: telephone: phone:
-
Arrea:
Zhejiang
Address:21 Chaoyuan Road, Huangyan District, Taizhou City, Zhejiang, China
- Website:
+
Mold Parameters
Product name |
Automotive interior trim mould |
Product Material |
PP, PC, PS, PA6, POM, PE, PU, PVC, ABS, PMMA etc |
Mould cavity |
L+R/1+1 etc |
Mould life |
500,000 times |
Mould testing |
All of the moulds can be well tested before the shipments |
Shaping Mode |
Plastic Injection Mould |
Production Workshop
Packing and Delivery
Each mold will be packed in sea-worthy wooden box before delivery.
1) Lubricate mold with grease;
2) Enroll the mold with plastic film;
3) Pack in a wooden case.
Usually molds will be shipped by sea. If in very urgent need, molds can be shipped by air.
Lead Time: 30 days after receipt the deposit
Our Services
1.OEM Manufacturing welcome: Customize the production mold and design product model for you.
2.We will reply you for your inquiry in 24 hours, if you have any questions,you can let me know, and I will help you.
3.After sending, we will track the products for you once every two days, until you get the products. When you got the goods, test them, and give me a feedback. If you have any questions about the problem, contact with us, we will offer the solve way for you.
FAQ
Q1: What kind of products does the factory mainly do?
A1: Plastic products for automobiles, electronic plastic products, and daily necessities plastic products.
Q2: How long is the general production cycle?
A2: In the absence of major changes to the customer. It takes 30-45 days from order to completion; it takes about 15 days from the confirmation of the customer to the delivery of the finished mold.
Q3: If you have problems after receiving the mold, what will you do?
A3: We have never encountered such problems. In the event of a factory failure, we will bear all costs incurred.
Q4: How to monitor the progress of the project?
A4: Our project department will designate the project engineer to follow up the progress of the project and communicate with the customer.
About Us
Zhejiang Yaxin Mould Co., Ltd. is a professional mold design and development company with innovative and strong vitality, and has a large scale and comprehensive technical strength. From the business negotiation to the mold handover, Yaxin Mould strictly follows the project management process, and is good at effectively communicating with customers and internal control, monitoring risks and effectively ensuring the project cycle.
http://www.yaxinmould.com/